(ANM - N/A) Crown Hills

Sirius Ecodev (Clapham) Limited at Sundon

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Sirius Ecodev (Clapham) Limited
Site name
(ANM - N/A) Crown Hills
Address
Clapham, Bedford, Bedfordshire, MK41 6ET
Grid reference
Easting 504481, northing 254059
Licence area
Eastern Power Networks (EPN)
Grid supply point
Sundon
Bulk supply point
Austin Canons Grid 33kV
Primary substation
Manton Ln Primary 11kV
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4 MW registered
Registered capacity
4 MW
Change to maximum export capacity
4 MW
Change to maximum import capacity
0.1 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
8 Aug 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Nov 2026
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Sundon

GSP view

69 other sites at this grid supply point in the November 2026 edition, 3 of them at Manton Ln Primary 11kV, the same primary substation. In all, the sites here total 1.1 GW: 0.5 GW connected, 0.6 GW accepted to connect.

  • Clapham Solar FarmThe Solar Building Company Limited, Solar, Manton Ln Primary 11kV primaryConnected7.05 MW
  • Building 16Twinwoods Heat & Power Limited, Bioenergy and waste, Manton Ln Primary 11kV primaryConnected3.2 MW
  • Manton LaneAggregated Micro Power Holdings, Bioenergy and waste, Manton Ln Primary 11kV primaryConnected2.5 MW
  • Buncefield LaneFreedom Power Solutions, Gas and other fossilConnected68.6 MW
  • Rookery PitCovanta Rookery, Bioenergy and wasteConnected66.4 MW
  • Chalgrave ManorAton Energy Development (Sundon) Limited, SolarAccepted50 MW
  • (ANM) Land Near LedburnAscott Estate Solar Limited, SolarAccepted49.99 MW
  • (ANM) New Bury FarmInterguide Group, SolarAccepted49.99 MW

See all 69

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?