(1U1637) Oakery No 2, The Oakery Landfill Site
Feltwell Energy Limited at Bramford
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 9 Sep 2003
- Status
- Connected
- Customer
- Feltwell Energy Limited
- Site name
- (1U1637) Oakery No 2, The Oakery Landfill Site
- Address
- Lodge Road, Theftford, Norfolk, IP26 4DR
- Grid reference
- Easting 573850, northing 292500
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Bramford
- Bulk supply point
- Thetford Grid 33kV
- Primary substation
- Feltwell Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Landfill Gas, Engine (combustion / reciprocating): 2.6 MW registered
- Registered capacity
- 2.6 MW
- Maximum export capacity
- 2.6 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Jul 2023
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Bramford
GSP view109 other sites at this grid supply point in the November 2026 edition, 1 of them at Feltwell Primary 11kV, the same primary substation. In all, the sites here total 2.3 GW: 1.0 GW connected, 1.3 GW accepted to connect.
- (1U1637) Oakery No 1, The Oakery Landfill SiteFeltwell Energy Limited, Bioenergy and waste, Feltwell Primary 11kV primaryConnected1.3 MW
- Gunfleet Sands Offshore TransmissionNational Grid Electricity Transmission PLC, WindConnected172.8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose