QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

(1U1637) Oakery No 1, The Oakery Landfill Site

Feltwell Energy Limited at Bramford

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
9 Sep 2003
Status
Connected
Customer
Feltwell Energy Limited
Site name
(1U1637) Oakery No 1, The Oakery Landfill Site
Address
Lodge Road, Theftford, Norfolk, IP26 4DR
Grid reference
Easting 573850, northing 292500
Licence area
Eastern Power Networks (EPN)
Grid supply point
Bramford
Bulk supply point
Thetford Grid 33kV
Primary substation
Feltwell Primary 11kV
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
Biofuel - Landfill Gas, Engine (combustion / reciprocating): 1.3 MW registered
Registered capacity
1.3 MW
Maximum export capacity
1.3 MW
Maximum import capacity
0.15 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1023542073898
Import MPAN
1023542073666
Last updated
14 Jul 2023
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Bramford

GSP view

109 other sites at this grid supply point in the November 2026 edition, 1 of them at Feltwell Primary 11kV, the same primary substation. In all, the sites here total 2.3 GW: 1.0 GW connected, 1.3 GW accepted to connect.

See all 109

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?