Tilbury Docks Ph2

Thameside Energy Recovery Facility Limited 2021 at Tilbury

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Oct 2025
Status
Accepted to connect
Customer
Thameside Energy Recovery Facility Limited 2021
Site name
Tilbury Docks Ph2
Address
Tilbury, Essex, RM18 7NU
Grid reference
Easting 536770, northing 176151
Licence area
Eastern Power Networks (EPN)
Grid supply point
Tilbury
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 40 MW registered
Registered capacity
40 MW
Change to maximum export capacity
40 MW
Change to maximum import capacity
4.75 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
22 Aug 2017
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
033458-033458
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Nov 2026
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Capacity changed from 20 MW to 40 MW
  • October 2026 edition
    Customer changed from ESB International to Thameside Energy Recovery Facility Limited 2021
  • October 2026 edition
    Export capacity changed from 20 MW to 40 MW

Also at Tilbury

GSP view

23 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 464 MW: 216 MW connected, 248 MW accepted to connect.

See all 23

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?