Woodend Wind Farm

Wind Estate (UK) Limited at Drumcross

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2031
Status
Accepted to connect
Planning consent
Application submitted 16 Jun 2023
West Lothian, reference 0434/FUL/23 · Source: REPD
Customer
Wind Estate (UK) Limited
Site name
Woodend Wind Farm
Address
Heights Road, Blackridge, Bathgate, West Lothian, EH48 3SW
Grid reference
Easting 290128, northing 669058
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Drumcross
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 25.2 MW registered
Registered capacity
25.2 MW
Change to maximum export capacity
16 MW
Change to maximum import capacity
0.1 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
14 Dec 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
26 Aug 2026
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 6 editions. Not found at 1 MW or over in the July 2026 edition.

Changes to the details QueueWatch tracks, newest first.

  • July 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No change to any detail QueueWatch tracks.

Also at Drumcross

GSP view

9 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 196 MW: 127 MW connected, 69 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.