- Date connected
- Not stated
- Status
- Connected
- Customer
- EDF
- Site name
- Shin Etsu CHP
- Address
- Toll Roundabout, Wilson Road, Livingston, West Lothian, EH54 7DA
- Grid reference
- Easting 302316, northing 667243
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Drumcross
- Bulk supply point
- Not stated
- Primary substation
- SHINETSU (Customer substation)
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- CHP, Steam-gas turbine (CCGT): 4.7 MW registered
- Registered capacity
- 4.7 MW
- Maximum export capacity
- 0 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 2 Sep 2020
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Sep 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- July 2026 editionStatus changed from “accepted to connect” to “connected”
- July 2026 editionTarget energisation date not stated (31 Dec 2025 in the June 2026 edition)
- July 2026 editionFlexible connection changed from “yes” to “no”
- July 2026 editionIn a connection queue changed from “yes” to “no”
Also at Drumcross
GSP view9 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 196 MW: 127 MW connected, 69 MW accepted to connect.
- West Benhar Wind FarmEdf Energy Renewables (Formerly Partnerships For Renewables/Fauldhouse Wind Farm Llp), WindConnected28.8 MW
- Camilty WindfarmEdf Energy Renewables (Formerly Partnerships For Renewables/Camilty Wind Farm Llp), WindAccepted21.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?