Edf

Customer named in the DNOs’ registers

In SPEN’s September 2026 edition

The registers spell this customer’s name more than one way: “Edf” (5 sites) and “EDF” (1 site).

6sites of 1 MW and over
116 MWcapacity
116 MWconnected (6 sites)
–accepted to connect (0 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
SPENSeptember 2026 edition6116 MW116 MW–

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Wind5111 MW111 MW–
Gas and other fossil14.7 MW4.7 MW–

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Longpark WindfarmSPENGalashielsWindConnected38
Burnfoot WindfarmSPENDevonsideWindConnected29.5
Pearie Law WindfarmSPENLivingston EastWindConnected19.2
Rhodders WindfarmSPENDevonsideWindConnected12.3
Barmoor WindfarmSPENBerwickWindConnected12
Shin Etsu CHPSPENDrumcrossGas and other fossilConnected4.7

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
DevonsideSPEN241.8 MW–
GalashielsSPEN138 MW–
Livingston EastSPEN119.2 MW–
BerwickSPEN112 MW–
DrumcrossSPEN14.7 MW–

What changed recently

Changes to its sites found in both editions of each pair, newest first.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 6 sites matched. Every August site and every September site had a match in the other edition.

  • Shin Etsu CHPSPEN, July 2026 editionFlexible connection changed from “yes” to “no”
  • Shin Etsu CHPSPEN, July 2026 editionIn a connection queue changed from “yes” to “no”
  • Shin Etsu CHPSPEN, July 2026 editionStatus changed from “accepted to connect” to “connected”
  • Shin Etsu CHPSPEN, July 2026 editionTarget energisation date not stated (31 Dec 2025 in the June 2026 edition)
  • Pearie Law WindfarmSPEN, May 2026 editionIn a connection queue changed from “yes” to “no”
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?