Lochfergus Farm

Locogen Developments Ltd at Ayr

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Aug 2027
Status
Accepted to connect
Customer
Locogen Developments Ltd
Site name
Lochfergus Farm
Address
Lochfergus Farm, Masonhill, Coylton, South Ayrshire, KA6 6LP
Grid reference
Easting 238920, northing 618868
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Ayr
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy, Storage - Electrochemical (Batteries): 46.83 MW registered
Energy source 2
Solar, Photovoltaic: 52.448 MW registered
Registered capacity
99.278 MW
Change to maximum export capacity
45 MW
Change to maximum import capacity
40.5 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
7 Jan 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
27 Oct 2022
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • May 2026 edition
    Capacity changed from 87.8 MW to 99.278 MW

Also at Ayr

GSP view

2 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 256 MW: 256 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?