Gladsmuir Wind Farm
Wind Estate (UK) Ltd at Bathgate
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 29 Oct 2032
- Status
- Accepted to connect
- Planning consent
- Granted 13 Oct 2025
West Lothian, reference 0706/FUL/22 · Source: REPD - Customer
- Wind Estate (UK) Ltd
- Site name
- Gladsmuir Wind Farm
- Address
- Gladsmuir Wind Farm Sation, Muldron, Bathgate, West Lothian, EH47 9AD
- Grid reference
- Easting 292900, northing 658300
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Bathgate
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 31 MW registered
- Registered capacity
- 31 MW
- Change to maximum export capacity
- 31 MW
- Change to maximum import capacity
- 0.1 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 14 Dec 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- SPT-RI-2084, SPT-RI-3002, SPT-RI-3168, SPT-RI-3924, SPT-RI-4366
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 8 Jan 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- August 2026 editionCapacity changed from 43.4 MW to 31 MW
- August 2026 editionExport capacity changed from 41.5 MW to 31 MW
Also at Bathgate
GSP view16 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 195 MW: 90 MW connected, 105 MW accepted to connect.
- Tormywheel Wind extensionMuirhall Energy Ltd, Wind, TORMYWHEEL WINDFARM (33kV) primaryAccepted9.6 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.