Tormywheel Wind extension

Muirhall Energy Ltd at Bathgate

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
29 Oct 2027
Status
Accepted to connect
Customer
Muirhall Energy Ltd
Site name
Tormywheel Wind extension
Address
Tormywheel Wind Farm, A704, Fauldhouse, West Lothian, EH55 8JW
Grid reference
Easting 295630, northing 658381
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Bathgate
Bulk supply point
Not stated
Primary substation
TORMYWHEEL WINDFARM (33kV)
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 9.6 MW registered
Registered capacity
9.6 MW
Change to maximum export capacity
9.4 MW
Change to maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
29 Jan 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
28 Oct 2022
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • May 2026 edition
    Export capacity changed from 9.5 MW to 9.4 MW

Also at Bathgate

GSP view

16 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 195 MW: 90 MW connected, 105 MW accepted to connect.

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?