QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

ENWL Tritax Symmetry Parkside (55/285171B)

At Rainhill

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
30 Sep 2026
Status
Connected
Customer
Not stated
Site name
ENWL Tritax Symmetry Parkside (55/285171B)
Address
Merseyside
Grid reference
Not stated
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Rainhill
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 12.53 MW registered
Registered capacity
12.53 MW
Maximum export capacity
0 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
2 Apr 2025
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at Rainhill

GSP view

26 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 216 MW: 183 MW connected, 33 MW accepted to connect.

See all 26

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose