Combermere Abbey
AMP GM003 LTD at Cellarhead
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 31 Mar 2015
- Status
- Connected
- Customer
- AMP GM003 LTD
- Site name
- Combermere Abbey
- Address
- AdjaceNot to StoNoe Lodge, Whitchurch, Whitchurch, Cheshire, SY13 4AL
- Grid reference
- Easting 360334, northing 344779
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Cellarhead
- Bulk supply point
- COPPENHALL GT1 / CREWE GT1 / CREWE GT2A / CREWE GT4A / RADWAY GREEN GT1 / RADWAY GREEN GT2 / WHITCHURCH GT2
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 10.451 MW registered
- Registered capacity
- 10.451 MW
- Maximum export capacity
- 10.451 MW
- Maximum import capacity
- 0.03 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300060579182
- Import MPAN
- 1300060579173
- Last updated
- 11 Nov 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Cellarhead
GSP view10 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 115 MW: 29 MW connected, 86 MW accepted to connect.
- Bentley MotorsQuiNotas ENoergy UK, Solar, ROLLS ROYCE T1 / ROLLS ROYCE T2 / ROLLS ROYCE T3 primaryAccepted14.1 MW
- Rolls RoyceQuiNotas ENoergy UK, Solar, ROLLS ROYCE T1 / ROLLS ROYCE T2 / ROLLS ROYCE T3 primaryConnected7.1 MW
- Maw Green No 2INofiNois ENoergy Services Ltd, Bioenergy and waste, MAW GREEN GEN primaryConnected3.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose