Biogen Waen
Biogen Waen at Connahs Quay
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Biogen Waen
- Site name
- Biogen Waen
- Address
- Biogen Waen, Holywell Road, Holywell, North Wales, LL17 0DS
- Grid reference
- Easting 305539, northing 375039
- Licence area
- Merseyside, Cheshire and North Wales (SPM)
- Grid supply point
- Connahs Quay
- Bulk supply point
- HOLYWELL GT1 / RHYL GT1 / ST ASAPH GT2 / ST ASAPH GT4
- Primary substation
- EGA ELECTRIC T1
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Biofuel - Biogas from anaerobic digestion (excluding landfill & sewage), Engine (combustion / reciprocating): 1.1 MW registered
- Registered capacity
- 1.1 MW
- Maximum export capacity
- 1.1 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1300060438826
- Import MPAN
- Not stated
- Last updated
- 14 Sep 2020
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Connahs Quay
GSP view31 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 459 MW: 281 MW connected, 178 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose