Balmore WTW
FES Support Services at Killermont
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- FES Support Services
- Site name
- Balmore WTW
- Address
- Balmore Water Treatment Works, Glenorchard Road, Torrance, East Dunbartonshire, G64 4AL
- Grid reference
- Easting 260332, northing 674133
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Killermont
- Bulk supply point
- Not stated
- Primary substation
- BALMORE (11kV)
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 5.145 MW registered
- Registered capacity
- 5.145 MW
- Maximum export capacity
- 5.145 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 5 Nov 2021
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1800061287736
- Import MPAN
- 1800035324283
- Last updated
- 29 Nov 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
- May 2026 editionCustomer changed from SP Distribution plc to FES Support Services
Also at Killermont
GSP view5 other sites at this grid supply point in the September 2026 edition, 1 of them at BALMORE (11kV), the same primary substation. In all, the sites here total 82.6 MW: 11.2 MW connected, 71.4 MW accepted to connect.
- Summerston Landfill 1 & 2Combined Landfill Projects (Clp), Bioenergy and waste, MILTON (11kV) primaryConnected5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose