QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WESTLANDS FARM

Name not shown at MELKSHAM GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Name not shown
Site name
WESTLANDS FARM
Address
MELKSHAM WEST, WESTLANDS LANE, WHITELY, MELKSHAM, SN12 7QG
Grid reference
Easting 389389, northing 166695
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Other or not stated
Energy source 1
49.95 MW registered
Registered capacity
49.95 MW
Maximum export capacity
49.95 MW
Maximum import capacity
0.19 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060759842
Import MPAN
2000060759870
Last updated
12 Feb 2026
Tracked since
July 2025 edition

Change history

Tracked since the July 2025 edition, across 17 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?