QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

WEST WOODLANDS PV

SUNSAVE 24 (WEST WOODLANDS) LIMITED at MELKSHAM GSP

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
SUNSAVE 24 (WEST WOODLANDS) LIMITED
Site name
WEST WOODLANDS PV
Address
WEST WOODLANDS PV, FROME, SOMERSET, BA11 5EN
Grid reference
Easting 377756, northing 143938
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
FROME
Primary substation
WEST WOODLAND PV
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 3.876 MW registered
Registered capacity
3.876 MW
Maximum export capacity
3.876 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056455270
Import MPAN
2000056455252
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose