STEELSTRATH 1037KVA/500KW

At FIDDES

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Sep 2027
Status
Accepted to connect
Customer
Not stated
Site name
STEELSTRATH 1037KVA/500KW
Address
STEELSTRATH, STEELSTRATH, LAURENCEKIRK, KINCARDINESHIRE, AB30 1RN
Grid reference
Easting 364099, northing 768844
Licence area
North of Scotland (SHEPD)
Grid supply point
FIDDES
Bulk supply point
Not stated
Primary substation
EDZELL
Connection voltage
Not stated
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 0.001 MW registered
Registered capacity
0.001 MW
Change to maximum export capacity
1.027 MW
Change to maximum import capacity
1.027 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
30 Sep 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
12 Oct 2026
Tracked since
November 2026 edition

Change history

Tracked since the November 2026 edition.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at FIDDES

GSP view

18 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 456 MW: 86 MW connected, 370 MW accepted to connect.

See all 18

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?