QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

SNARLTON LANE

RENEWABLE POWER LIMITED at MELKSHAM GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
6 Aug 2025
Status
Accepted to connect
Customer
RENEWABLE POWER LIMITED
Site name
SNARLTON LANE
Address
SNARLTON LANE, SNARLTON LANE, MELKSHAM, WILTSHIRE, SN12 7QP
Grid reference
Easting 392005, northing 163835
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
Not stated
Primary substation
SANDRIDGE PV FARM
Connection voltage
132 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 49.9 MW registered
Registered capacity
49.9 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
47.405 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
2 Aug 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 6 Aug 2025 (not stated in the October 2025 edition)

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the November 2026 edition, 1 of them at SANDRIDGE PV FARM, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?