QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

NORTHACRE INDUSTRIAL PARK

YLEM ENERGY LIMITED at MELKSHAM GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
22 Dec 2025
Status
Connected
Customer
YLEM ENERGY LIMITED
Site name
NORTHACRE INDUSTRIAL PARK
Address
PLOT D2, WESTBURY, WILTSHIRE, BA13 4EW
Grid reference
Easting 385696, northing 152288
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
FROME
Primary substation
HAWKERIDGE
Connection voltage
Not stated
Technology group
Other or not stated
Energy source 1
7.22 MW registered
Registered capacity
7.22 MW
Maximum export capacity
7.22 MW
Maximum import capacity
0.333 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060907971
Import MPAN
2000060907962
Last updated
12 Oct 2026
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to the details QueueWatch tracks, newest first.

No changes to show: it has been found in one edition.

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose