QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

NEXTPOWER BINDWELL LIMITED

NEXTPOWER BINDWELL LIMITED at AXMINSTER

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
NEXTPOWER BINDWELL LIMITED
Site name
Not stated
Address
BINDWELL LANE PV, BINDWELL LANE, YEOVIL,, SOMERSET, BA22 7NF
Grid reference
Easting 359664, northing 124575
Licence area
Southern England (SEPD)
Grid supply point
AXMINSTER
Bulk supply point
YEOVIL
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 9 MW registered
Registered capacity
9 MW
Maximum export capacity
9 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060633972
Import MPAN
Not stated
Last updated
13 May 2026
Tracked since
May 2026 edition

Change history

Tracked since the May 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at AXMINSTER

GSP view

24 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 408 MW: 126 MW connected, 282 MW accepted to connect.

See all 24

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?