QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

MANOR COURT FARM PV

TROWLE SOLAR LIMITED at MELKSHAM GSP

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
14 Jan 2016
Status
Connected
Customer
TROWLE SOLAR LIMITED
Site name
MANOR COURT FARM PV
Address
TROWBRIDGE, WILTSHIRE, BA14 9BR
Grid reference
Easting 383893, northing 158353
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
NORRINGTON
Primary substation
MANOR COURT TROWBRIDGE
Connection voltage
33 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 4.18 MW registered
Registered capacity
4.18 MW
Maximum export capacity
4.18 MW
Maximum import capacity
0.048 MW
Flexible connection
No
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000056477682
Import MPAN
2000056477646
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2023 edition
    Capacity changed from 4.632 MW to 4.18 MW

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the November 2026 edition, 1 of them at MANOR COURT TROWBRIDGE, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?