LERWICK PS (G1DATA NOT AVAILABLE)
SSE GENERATION LTD at GREMISTA
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- SSE GENERATION LTD
- Site name
- LERWICK PS (G1DATA NOT AVAILABLE)
- Address
- LERWICK PS (G1DATA NOT AVAILABLE), LERWICK, SHETLAND, SHETLAND ISLANDS, ZE1 0PS
- Grid reference
- Easting 446456, northing 1142794
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- GREMISTA
- Bulk supply point
- Not stated
- Primary substation
- GREMISTA
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- WIND, ONSHORE WIND TURBINES: 4.275 MW registered
- Registered capacity
- 4.275 MW
- Maximum export capacity
- 4.275 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1700051731088
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2026
- Tracked since
- November 2023 edition
Change history
Tracked since the November 2023 edition, across 35 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at GREMISTA
GSP view24 other sites at this grid supply point in the September 2026 edition, 21 of them at GREMISTA, the same primary substation. In all, the sites here total 296 MW: 81 MW connected, 215 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose