KINLOSS BARRACKS PV
DEFENCE INFRASTRUCTURE ORGANISATION at ELGIN
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 1 Sep 2026
- Status
- Accepted to connect
- Customer
- DEFENCE INFRASTRUCTURE ORGANISATION
- Site name
- KINLOSS BARRACKS PV
- Address
- KINLOSS BARRACKS PV, KINLOSS BARRACKS, KINLOSS, MORAYSHIRE, IV36 0UE
- Grid reference
- Easting 306980, northing 861288
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- ELGIN
- Bulk supply point
- Not stated
- Primary substation
- KINLOSS
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 2.64 MW registered
- Registered capacity
- 2.64 MW
- Change to maximum export capacity
- 0 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 1 Sep 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- September 2025 edition
Change history
Tracked since the September 2025 edition, across 15 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionExport capacity changed from 2.64 MW to 0 MW
- July 2026 editionExport capacity changed from 0 MW to 2.64 MW
- February 2026 editionExport capacity changed from 2.08 MW to 0 MW
- November 2025 editionTarget energisation date stated as 1 Sep 2026 (not stated in the October 2025 edition)
Also at ELGIN
GSP view7 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 525 MW: 525 MW accepted to connect.
- WESTER COVESEA SOLAR, WIND AND STORAGEBSR APPLICATIONS LIMITED, Wind, ELGIN GRID primaryAccepted180 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?