KINCARDINE OFFSHORE WINDFARM

ATKINS LTD at REDMOSS

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
11 Jun 2024
Status
Connected
Customer
ATKINS LTD
Site name
KINCARDINE OFFSHORE WINDFARM
Address
ABERDEEN, ABERDEEN, AB12 3LF
Grid reference
Easting 395187, northing 802050
Licence area
North of Scotland (SHEPD)
Grid supply point
REDMOSS
Bulk supply point
Not stated
Primary substation
REDMOSS GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 49.6 MW registered
Registered capacity
49.6 MW
Maximum export capacity
49.6 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700000000812
Import MPAN
1700053118648
Last updated
12 Feb 2026
Tracked since
June 2024 edition

Change history

Tracked since the June 2024 edition, across 29 editions. Not found at 1 MW or over in the September 2025 edition.

Changes to the details QueueWatch tracks, newest first.

  • October 2025 edition
    Capacity changed from 52.211 MW to 49.6 MW
  • September 2025 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

Also at REDMOSS

GSP view

9 other sites at this grid supply point in the November 2026 edition, 3 of them at REDMOSS GRID, the same primary substation. In all, the sites here total 182 MW: 77 MW connected, 105 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?