ALTENS 10MW PV + ELECTOLYSER
Name not shown at REDMOSS
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Jul 2026
- Status
- Accepted to connect
- Customer
- Name not shown
- Site name
- ALTENS 10MW PV + ELECTOLYSER
- Address
- HARENESS ROAD, ABERDEEN, ABERDEENSHIRE, AB12 3LE
- Grid reference
- Easting 395336, northing 802723
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- REDMOSS
- Bulk supply point
- Not stated
- Primary substation
- REDMOSS GRID
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- ADVANCED FUEL GASIFICATION OR PYROLYSIS, GAS TURBINE (OCGT): 10 MW registered
- Registered capacity
- 10 MW
- Change to maximum export capacity
- 8 MW
- Change to maximum import capacity
- 4.156 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 23 Jun 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2025 editionTarget energisation date stated as 31 Jul 2026 (not stated in the October 2025 edition)
- September 2023 editionTechnology changed from Solar to Bioenergy and waste
- September 2023 editionCustomer stated, name not shown (not stated in the August 2023 edition)
Also at REDMOSS
GSP view9 other sites at this grid supply point in the November 2026 edition, 3 of them at REDMOSS GRID, the same primary substation. In all, the sites here total 182 MW: 77 MW connected, 105 MW accepted to connect.
- KEMPSTONE HILL WIND ENERGY LTDKEMPSTONE HILL WIND ENERGY LTD, Wind, NEWTONHILL primaryConnected2.4 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?