CRAIGSHAW DRIVE EV & BESS

At REDMOSS

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Jan 2032
Status
Accepted to connect
Customer
Not stated
Site name
CRAIGSHAW DRIVE EV & BESS
Address
ABERDEEN, ABERDEENSHIRE, AB12 3AH
Grid reference
Easting 394236, northing 803668
Licence area
North of Scotland (SHEPD)
Grid supply point
REDMOSS
Bulk supply point
Not stated
Primary substation
KINCORTH
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 5.8 MW registered
Registered capacity
5.8 MW
Change to maximum export capacity
2.86 MW
Change to maximum import capacity
2.86 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
23 Mar 2026
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Apr 2026
Tracked since
April 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the April 2026 edition, across 8 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at REDMOSS

GSP view

9 other sites at this grid supply point in the November 2026 edition, 2 of them at KINCORTH, the same primary substation. In all, the sites here total 182 MW: 77 MW connected, 105 MW accepted to connect.

See all 9

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?