INVERLAEL HYDRO STATION
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- Not stated
- Site name
- INVERLAEL HYDRO STATION
- Address
- INVERLAEL HYDRO STATION PRIVATE GENERATOR, GARVE, HIGHLAND, IV23 2SE
- Grid reference
- Easting 215803, northing 888422
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- GRUDIE BRIDGE
- Bulk supply point
- Not stated
- Primary substation
- GRUDIE BRIDGE
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 2.375 MW registered
- Registered capacity
- 2.375 MW
- Maximum export capacity
- 2.375 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1700052250178
- Import MPAN
- 1700052250169
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 40 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at GRUDIE BRIDGE
GSP view22 other sites at this grid supply point in the November 2026 edition, 19 of them at GRUDIE BRIDGE, the same primary substation. In all, the sites here total 215 MW: 55 MW connected, 160 MW accepted to connect.
- GRUDIE BRIDGE POWER STATIONSSE GENERATION LTD, Hydro and marine, GRUDIE BRIDGE primaryConnected12.54 MW
- GRUDIE BRIDGE POWER STATIONSSE GENERATION LTD, Hydro and marine, GRUDIE BRIDGE primaryConnected11.4 MW
- WYVIS HYDRO PROJECTSWYVIS ONE ESTATE LIMITED, Hydro and marine, GRUDIE BRIDGE primaryConnected3.705 MW
- ATTADALE HYDRO GENERATING STATIONHONISTER ENERGY LIMITED, Wind, GRUDIE BRIDGE primaryConnected3.5 MW
- ACHANALT POWER STATIONSSE GENERATION LTD, Other or not stated, GRUDIE BRIDGE primaryConnected2.945 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?