GRUDIE BRIDGE 49.4MW BESS

At GRUDIE BRIDGE

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
28 Feb 2029
Status
Accepted to connect
Customer
Not stated
Site name
GRUDIE BRIDGE 49.4MW BESS
Address
LAND AT GRUDIE WOODLAND, LOCHLUICHART, GARVE, HIGHLAND, IV23 2PZ
Grid reference
Easting 232877, northing 863027
Licence area
North of Scotland (SHEPD)
Grid supply point
GRUDIE BRIDGE
Bulk supply point
Not stated
Primary substation
GRUDIE BRIDGE
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 53.2 MW registered
Registered capacity
53.2 MW
Change to maximum export capacity
49.4 MW
Change to maximum import capacity
52 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
25 Aug 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
September 2023 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2023 edition, across 38 editions. Not found at 1 MW or over in the November 2023 edition.

Changes to the details QueueWatch tracks, newest first.

  • December 2025 edition
    Customer not stated (name not shown in the November 2025 edition)
  • November 2025 edition
    Target energisation date stated as 28 Feb 2029 (not stated in the October 2025 edition)
  • November 2023 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

Also at GRUDIE BRIDGE

GSP view

22 other sites at this grid supply point in the November 2026 edition, 19 of them at GRUDIE BRIDGE, the same primary substation. In all, the sites here total 215 MW: 55 MW connected, 160 MW accepted to connect.

See all 22

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?