QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

HILL OF LYBSTER WIND TURBINES LLP

HILL OF LYBSTER WIND TURBINES LLP at DOUNREAY

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
27 Nov 2024
Status
Connected
Customer
HILL OF LYBSTER WIND TURBINES LLP
Site name
Not stated
Address
THURSO, HIGHLAND, KW14 7UZ
Grid reference
Easting 302297, northing 969827
Licence area
North of Scotland (SHEPD)
Grid supply point
DOUNREAY
Bulk supply point
Not stated
Primary substation
DOUNREAY
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 2.3 MW registered
Registered capacity
2.35 MW
Maximum export capacity
2.35 MW
Maximum import capacity
0.043 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700060087287
Import MPAN
Not stated
Last updated
12 Feb 2026
Tracked since
April 2025 edition

Change history

Tracked since the April 2025 edition, across 20 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at DOUNREAY

GSP view

8 other sites at this grid supply point in the November 2026 edition, 6 of them at DOUNREAY, the same primary substation. In all, the sites here total 381 MW: 63 MW connected, 318 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?