QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

FT HARLESFORD FARM

LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED at COWLEY GSP

SSEN Embedded Capacity Register, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
1 Oct 2027
Status
Accepted to connect
Customer
LOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED
Site name
FT HARLESFORD FARM
Address
HARLESFORD SOLAR FARM, HARLESFORD FARM, TETSWORTH, THAME, OXFORDSHIRE, OX9 7BT
Grid reference
Easting 467961, northing 201463
Licence area
Southern England (SEPD)
Grid supply point
COWLEY GSP
Bulk supply point
COWLEY LOCAL
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 20 MW registered
Registered capacity
20 MW
Change to maximum export capacity
20 MW
Change to maximum import capacity
0.053 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
7 Dec 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked from the August 2023 edition to the March 2026 edition, across 31 editions. Not found in the June 2024 edition.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode
  • June 2024 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at COWLEY GSP

GSP view

71 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 2 GW: 0.4 GW connected, 1.6 GW accepted to connect.

See all 71

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose