QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

FLEET AIR ARM MUSEUM

NMRN OPERATIONS at AXMINSTER

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
NMRN OPERATIONS
Site name
FLEET AIR ARM MUSEUM
Address
COBHAM HALL (ARCHIVE BUILDING), YEOVIL, SOMERSET, BA22 8HT
Grid reference
Easting 354726, northing 123801
Licence area
Southern England (SEPD)
Grid supply point
AXMINSTER
Bulk supply point
YEOVIL
Primary substation
CHILTON CANTELO
Connection voltage
0.4 kV
Technology group
Other or not stated
Energy source 1
4.01 MW registered
Registered capacity
4.01 MW
Maximum export capacity
4.01 MW
Maximum import capacity
0.285 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060686510
Import MPAN
2000050553993
Last updated
12 Feb 2026
Tracked since
July 2025 edition

Change history

Tracked since the July 2025 edition, across 15 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at AXMINSTER

GSP view

25 other sites at this grid supply point in the September 2026 edition, 2 of them at CHILTON CANTELO, the same primary substation. In all, the sites here total 507 MW: 126 MW connected, 381 MW accepted to connect.

See all 25

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose