FLEET AIR ARM MUSEUM
NMRN OPERATIONS at AXMINSTER
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- NMRN OPERATIONS
- Site name
- FLEET AIR ARM MUSEUM
- Address
- COBHAM HALL (ARCHIVE BUILDING), YEOVIL, SOMERSET, BA22 8HT
- Grid reference
- Easting 354726, northing 123801
- Licence area
- Southern England (SEPD)
- Grid supply point
- AXMINSTER
- Bulk supply point
- YEOVIL
- Primary substation
- CHILTON CANTELO
- Connection voltage
- 0.4 kV
- Technology group
- Other or not stated
- Energy source 1
- 4.01 MW registered
- Registered capacity
- 4.01 MW
- Maximum export capacity
- 4.01 MW
- Maximum import capacity
- 0.285 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000060686510
- Import MPAN
- 2000050553993
- Last updated
- 12 Feb 2026
- Tracked since
- July 2025 edition
Change history
Tracked since the July 2025 edition, across 15 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at AXMINSTER
GSP view25 other sites at this grid supply point in the September 2026 edition, 2 of them at CHILTON CANTELO, the same primary substation. In all, the sites here total 507 MW: 126 MW connected, 381 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose