FAIRTHORNE GRANGE RAGLINGTON
CERTUS UTILITY CONSULTING LTD at BOTLEY WOOD GSP
SSEN Embedded Capacity Register, March 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 13 Jan 2030
- Status
- Accepted to connect
- Customer
- CERTUS UTILITY CONSULTING LTD
- Site name
- FAIRTHORNE GRANGE RAGLINGTON
- Address
- FAIRTHORNE GRANGE RAGLINGTON, A334 SHEDFIELD, SOUTHAMPTON, HAMPSHIRE, SO32 2HL
- Grid reference
- Easting 454303, northing 113436
- Licence area
- Southern England (SEPD)
- Grid supply point
- BOTLEY WOOD GSP
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 54 MW registered
- Registered capacity
- 54 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 0.526 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 28 Sep 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- December 2025 edition
Change history
Tracked from the December 2025 edition to the March 2026 edition, across 4 editions.
Changes to its status, capacity, technology or customer, newest first.
- April 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at BOTLEY WOOD GSP
GSP view17 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 421 MW: 103 MW connected, 318 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose