FACCOMBE ESTATE
At MELKSHAM GSP
SSEN Embedded Capacity Register, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 9 Oct 2026
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- FACCOMBE ESTATE
- Address
- SELFS FARM, FACCOMBE ESTATE FACCOMBE, ANDOVER, HAMPSHIRE, SP11 0DX
- Grid reference
- Easting 438875, northing 158027
- Licence area
- Southern England (SEPD)
- Grid supply point
- MELKSHAM GSP
- Bulk supply point
- ANDOVER
- Primary substation
- HURSTBOURNE TARRANT
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 2.425 MW registered
- Energy source 2
- WIND, ONSHORE WIND TURBINES: 0.53 MW registered
- Registered capacity
- 2.425 MW
- Change to maximum export capacity
- 0.53 MW
- Change to maximum import capacity
- 0.53 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 9 Oct 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- November 2025 edition
Change history
Tracked since the November 2025 edition, across 13 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionExport capacity changed from 2.425 MW to 0.53 MW
- September 2026 editionExport capacity changed from 0.53 MW to 2.425 MW
- April 2026 editionExport capacity changed from 2.425 MW to 0.53 MW
- February 2026 editionExport capacity changed from 0.669 MW to 2.425 MW
Also at MELKSHAM GSP
GSP view95 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.
- SOLAR PV AND BATTERY 50MW IMPORT 50MW EXPORTLOW CARBON UK SOLAR INVESTMENT COMPANY LIMITED, SolarAccepted50 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?