CRAIGSHAW DRIVE EV & BESS
At REDMOSS
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 22 May 2033
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- CRAIGSHAW DRIVE EV & BESS
- Address
- LAND ADJACENT TO KINCORTH PRIMARY SUBSTA WEST TULLOS INDUSTRIAL ESTATE, ABERDEEN, ABERDEENSHIRE, AB12 3AH
- Grid reference
- Easting 394236, northing 803670
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- REDMOSS
- Bulk supply point
- Not stated
- Primary substation
- KINCORTH
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 5.8 MW registered
- Registered capacity
- 5.8 MW
- Change to maximum export capacity
- 5 MW
- Change to maximum import capacity
- 5 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 28 Jun 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- April 2026 edition
Change history
Tracked since the April 2026 edition, across 6 editions.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at REDMOSS
GSP view10 other sites at this grid supply point in the September 2026 edition, 2 of them at KINCORTH, the same primary substation. In all, the sites here total 186 MW: 77 MW connected, 109 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose