CONRAD (BILSHAM) LIMITED REQUOTE 7.2MW - GAS
CONRAD ENERGY (DEVELOPMENTS) LIMITED at LOVEDEAN GSP
SSEN Embedded Capacity Register, March 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 12 Jun 2026
- Status
- Accepted to connect
- Customer
- CONRAD ENERGY (DEVELOPMENTS) LIMITED
- Site name
- CONRAD (BILSHAM) LIMITED REQUOTE 7.2MW - GAS
- Address
- NORTHWOOD FARM, ARUNDEL, WEST SUSSEX, BN18 0HX
- Grid reference
- Easting 498747, northing 102812
- Licence area
- Southern England (SEPD)
- Grid supply point
- LOVEDEAN GSP
- Bulk supply point
- CHICHESTER
- Primary substation
- BILSHAM
- Connection voltage
- Not stated
- Technology group
- Gas and other fossil
- Energy source 1
- ENGINE (COMBUSTION / RECIPROCATING), FOSSIL - OIL: 7.605 MW registered
- Registered capacity
- 7.605 MW
- Change to maximum export capacity
- 0.315 MW
- Change to maximum import capacity
- 0.315 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 11 Jan 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 12 Mar 2026
- Tracked since
- March 2026 edition
Change history
Found in the March 2026 edition only.
Changes to its status, capacity, technology or customer, newest first.
- April 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at LOVEDEAN GSP
GSP view59 other sites at this grid supply point in the September 2026 edition, 5 of them at BILSHAM, the same primary substation. In all, the sites here total 1.1 GW: 0.3 GW connected, 0.8 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose