BRANSBURY MANOR FARM
At MELKSHAM GSP
SSEN Embedded Capacity Register, May 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 15 Jul 2028
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- BRANSBURY MANOR FARM
- Address
- BRANSBURY MANOR FARM, BRANSBURY LANE, ANDOVER, HAMPSHIRE, SO21 3QJ
- Grid reference
- Easting 442220, northing 142323
- Licence area
- Southern England (SEPD)
- Grid supply point
- MELKSHAM GSP
- Bulk supply point
- ANDOVER
- Primary substation
- BARTON STACEY
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 7.2 MW registered
- Registered capacity
- 7.2 MW
- Change to maximum export capacity
- 7.2 MW
- Change to maximum import capacity
- 0.1 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 8 Jul 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- May 2026 edition
Change history
Found in the May 2026 edition only.
Another record at this location is on a separate page.
Changes to its status, capacity, technology or customer, newest first.
- June 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at MELKSHAM GSP
GSP view96 other sites at this grid supply point in the September 2026 edition, 2 of them at BARTON STACEY, the same primary substation. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose