CAIRNANDREW

INICIO FRESCO at MACDUFF

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
30 Jun 2031
Status
Accepted to connect
Customer
INICIO FRESCO
Site name
CAIRNANDREW
Address
CAIRNANDREW CHP, LAND AT CAIRNANDREW, BANFF, ABERDEENSHIRE, AB45 3QA
Grid reference
Easting 373844, northing 859204
Licence area
North of Scotland (SHEPD)
Grid supply point
MACDUFF
Bulk supply point
Not stated
Primary substation
MACDUFF GRID
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
ADVANCED FUEL GASIFICATION OR PYROLYSIS, GAS TURBINE (OCGT): 49.9 MW registered
Registered capacity
49.9 MW
Change to maximum export capacity
49.9 MW
Change to maximum import capacity
1.053 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
6 Jul 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 40 editions.

Changes to the details QueueWatch tracks, newest first.

  • November 2025 edition
    Target energisation date stated as 30 Jun 2031 (not stated in the October 2025 edition)

Also at MACDUFF

GSP view

20 other sites at this grid supply point in the November 2026 edition, 16 of them at MACDUFF GRID, the same primary substation. In all, the sites here total 398 MW: 79 MW connected, 319 MW accepted to connect.

See all 20

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose