AUCHTERAW FARM

FIELD AUCHTERAW LTD at FORT AUGUSTUS

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
FIELD AUCHTERAW LTD
Site name
AUCHTERAW FARM
Address
AUCHTERAW ENERGY STORAGE, FORT AUGUSTUS, HIGHLAND, PH32 4BT
Grid reference
Easting 235712, northing 808675
Licence area
North of Scotland (SHEPD)
Grid supply point
FORT AUGUSTUS
Bulk supply point
Not stated
Primary substation
FORT AUGUSTUS GRID
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 49.9 MW registered
Registered capacity
47.405 MW
Maximum export capacity
47.405 MW
Maximum import capacity
49.9 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
1700060144935
Import MPAN
1700060144926
Last updated
12 Feb 2026
Tracked since
June 2025 edition

Change history

Tracked since the June 2025 edition, across 16 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at FORT AUGUSTUS

GSP view

4 other sites at this grid supply point in the September 2026 edition, 3 of them at FORT AUGUSTUS GRID, the same primary substation. In all, the sites here total 172 MW: 51 MW connected, 121 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose