AUCHTERAW FARM
FIELD AUCHTERAW LTD at FORT AUGUSTUS
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- Not stated
- Status
- Connected
- Customer
- FIELD AUCHTERAW LTD
- Site name
- AUCHTERAW FARM
- Address
- AUCHTERAW ENERGY STORAGE, FORT AUGUSTUS, HIGHLAND, PH32 4BT
- Grid reference
- Easting 235712, northing 808675
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- FORT AUGUSTUS
- Bulk supply point
- Not stated
- Primary substation
- FORT AUGUSTUS GRID
- Connection voltage
- 33 kV
- Technology group
- Storage
- Energy source 1
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 49.9 MW registered
- Registered capacity
- 47.405 MW
- Maximum export capacity
- 47.405 MW
- Maximum import capacity
- 49.9 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 1700060144935
- Import MPAN
- 1700060144926
- Last updated
- 12 Feb 2026
- Tracked since
- June 2025 edition
Change history
Tracked since the June 2025 edition, across 16 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at FORT AUGUSTUS
GSP view4 other sites at this grid supply point in the September 2026 edition, 3 of them at FORT AUGUSTUS GRID, the same primary substation. In all, the sites here total 172 MW: 51 MW connected, 121 MW accepted to connect.
- GLEN BUCK HYDROGREEN ENERGY TRADING LTD, Hydro and marine, FORT AUGUSTUS GRID primaryConnected1.943 MW
- ALLT LADAIDH HYDROGREEN HIGHLAND ALLT LADAIDH (1148) LIMITED, Hydro and marine, FORT AUGUSTUS GRID primaryConnected1.283 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose