CONRAD (MELKSHAM) LIMITED
CONRAD (MELKSHAM) LIMITED at MELKSHAM GSP
SSEN Embedded Capacity Register, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 8 Sep 2020
- Status
- Connected
- Customer
- CONRAD (MELKSHAM) LIMITED
- Site name
- Not stated
- Address
- BRADFORD ROAD, MELKSHAM, WILTSHIRE, SN12 8LQ
- Grid reference
- Easting 389742, northing 163948
- Licence area
- Southern England (SEPD)
- Grid supply point
- MELKSHAM GSP
- Bulk supply point
- NORRINGTON
- Primary substation
- MELKSHAM TOWN
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- FOSSIL - GAS, ENGINE (COMBUSTION / RECIPROCATING): 6.84 MW registered
- Registered capacity
- 6.84 MW
- Maximum export capacity
- 6.84 MW
- Maximum import capacity
- 0.19 MW
- Flexible connection
- No
- In a connection queue
- Not published by SSEN
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- 2000057629948
- Import MPAN
- Not stated
- Last updated
- 12 Feb 2026
- Tracked since
- August 2023 edition
Change history
Tracked since the August 2023 edition, across 38 editions.
Changes to its status, capacity, technology or customer, newest first.
- October 2025 editionCustomer changed from CONRAD (MELKSHAM GSP) LIMITED to CONRAD (MELKSHAM) LIMITED
- September 2025 editionCustomer changed from CONRAD (MELKSHAM) LIMITED to CONRAD (MELKSHAM GSP) LIMITED
Also at MELKSHAM GSP
GSP view95 other sites at this grid supply point in the September 2026 edition, 2 of them at MELKSHAM TOWN, the same primary substation. In all, the sites here total 2 GW: 0.5 GW connected, 1.5 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose