QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

BERRY BURN EXTENSION WIND FARM

TNEI SERVICES LTD. at BERRYBURN GRID

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
TNEI SERVICES LTD.
Site name
BERRY BURN EXTENSION WIND FARM
Address
BERRY BURN EXTENSION WIND FARM, ALTYRE ESTATE, FORRES, MORAY, IV36 2QH
Grid reference
Easting 302547, northing 845737
Licence area
North of Scotland (SHEPD)
Grid supply point
BERRYBURN GRID
Bulk supply point
Not stated
Primary substation
BERRYBURN GRID
Connection voltage
33 kV
Technology group
Wind
Energy source 1
WIND, ONSHORE WIND TURBINES: 19.4 MW registered
Registered capacity
19.4 MW
Change to maximum export capacity
19.4 MW
Change to maximum import capacity
0.268 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
18 Jun 2019
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at BERRYBURN GRID

GSP view

5 other sites at this grid supply point in the September 2026 edition, 5 of them at BERRYBURN GRID, the same primary substation. In all, the sites here total 324 MW: 95 MW connected, 229 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose