BRANSBURY MANOR FARM

At MELKSHAM GSP

SSEN Embedded Capacity Register, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2037
Status
Accepted to connect
Customer
Not stated
Site name
BRANSBURY MANOR FARM
Address
BRANSBURY MANOR FARM, BRANSBURY BARTON STACEY, ANDOVER, HAMPSHIRE, SO21 3QJ
Grid reference
Easting 442220, northing 142323
Licence area
Southern England (SEPD)
Grid supply point
MELKSHAM GSP
Bulk supply point
ANDOVER
Primary substation
BARTON STACEY
Connection voltage
11 kV
Technology group
Solar
Energy source 1
SOLAR, PHOTOVOLTAIC: 10 MW registered
Energy source 2
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 5.263 MW registered
Registered capacity
10 MW
Change to maximum export capacity
10 MW
Change to maximum import capacity
5.263 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
31 Mar 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
10 Feb 2026
Tracked since
April 2025 edition

Change history

Tracked since the April 2025 edition, across 19 editions.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Export capacity changed from 5.263 MW to 10 MW
  • September 2026 edition
    Export capacity changed from 10 MW to 5.263 MW
  • July 2026 edition
    Export capacity changed from 5.263 MW to 10 MW
  • June 2026 edition
    Export capacity changed from 10 MW to 5.263 MW
  • February 2026 edition
    Export capacity changed from 5 MW to 10 MW
  • November 2025 edition
    Target energisation date stated as 31 Dec 2037 (not stated in the October 2025 edition)

Also at MELKSHAM GSP

GSP view

95 other sites at this grid supply point in the October 2026 edition, 1 of them at BARTON STACEY, the same primary substation. In all, the sites here total 1.9 GW: 0.5 GW connected, 1.4 GW accepted to connect.

See all 95

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose