49.9MW PV & BESS
At MACDUFF
SSEN Embedded Capacity Register, March 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 4 Feb 2026
- Status
- Accepted to connect
- Customer
- Not stated
- Site name
- 49.9MW PV & BESS
- Address
- MEIKLE HILTON, TURRIFF, ABERDEENSHIRE, AB53 5QU
- Grid reference
- Easting 373412, northing 852181
- Licence area
- North of Scotland (SHEPD)
- Grid supply point
- MACDUFF
- Bulk supply point
- Not stated
- Primary substation
- MACDUFF GRID
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- SOLAR, PHOTOVOLTAIC: 104 MW registered
- Energy source 2
- STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 49.9 MW registered
- Registered capacity
- 104 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 49.9 MW
- Flexible connection
- Not stated
- In a connection queue
- Not published by SSEN
- Date accepted
- 4 Feb 2025
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SSEN
- Transmission reinforcement reference
- Not published by SSEN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 10 Feb 2026
- Tracked since
- March 2025 edition
Change history
Tracked from the March 2025 edition to the March 2026 edition, across 13 editions.
Changes to its status, capacity, technology or customer, newest first.
- April 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No change to its status, capacity, technology or customer.
Also at MACDUFF
GSP view21 other sites at this grid supply point in the September 2026 edition, 17 of them at MACDUFF GRID, the same primary substation. In all, the sites here total 398 MW: 79 MW connected, 319 MW accepted to connect.
- MACDUFF BATTERY STORAGE LTDMACDUFF BATTERY STORAGE LTD, Other or not stated, MACDUFF GRID primaryAccepted48.19 MW
- MOUNT BLAIRY SOLAR FARM BROWNSIDE FARMMOUNT BLAIRY SOLAR FARM, Solar, MACDUFF GRID primaryAccepted35.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose