QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

LOUDWATER

LOUDWATER IMPORT at AMERSHAM

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
30 Jan 2025
Status
Connected
Customer
LOUDWATER IMPORT
Site name
LOUDWATER
Address
DEREHAMS LANE, HIGH WYCOMBE, BUCKINGHAMSHIRE, HP10 9RR
Grid reference
Easting 490531, northing 191093
Licence area
Southern England (SEPD)
Grid supply point
AMERSHAM
Bulk supply point
LOUDWATER
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
STORED ENERGY (ALL STORED ENERGY IRRESPECTVE OF THE ORIGINAL ENERGY SOURCE), STORAGE - ELECTROCHEMICAL (BATTERIES): 40 MW registered
Registered capacity
40 MW
Maximum export capacity
40 MW
Maximum import capacity
40 MW
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060744828
Import MPAN
2000060744819
Last updated
12 Feb 2026
Tracked since
April 2025 edition

Change history

Tracked since the April 2025 edition, across 18 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at AMERSHAM

GSP view

4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 242 MW: 41 MW connected, 201 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose