DE LA RUE INTERNATIONAL LTD ET AL

DE LA RUE INTERNATIONAL LTD ET AL at BRAMLEY (BASI)

SSEN Embedded Capacity Register, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
DE LA RUE INTERNATIONAL LTD ET AL
Site name
Not stated
Address
MILL, OVERTON MILL, BASINGSTOKE, HAMPSHIRE, RG25 3JG
Grid reference
Easting 451737, northing 150947
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (BASI)
Bulk supply point
BASINGSTOKE
Primary substation
OVERTON
Connection voltage
11 kV
Technology group
Bioenergy and waste
Energy source 1
WASTE, ENGINE (COMBUSTION / RECIPROCATING): 6 MW registered
Registered capacity
6 MW
Maximum export capacity
5.7 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000050935800
Import MPAN
2000027427398
Last updated
12 Feb 2026
Tracked since
August 2023 edition

Change history

Tracked since the August 2023 edition, across 38 editions.

Changes to its status, capacity, technology or customer, newest first.

  • December 2023 edition
    Status changed from “accepted to connect” to “connected”
  • December 2023 edition
    Capacity changed from 3.362 MW to 6 MW
  • December 2023 edition
    Customer changed from NICK BOOTH LIMITED to DE LA RUE INTERNATIONAL LTD ET AL

Also at BRAMLEY (BASI)

GSP view

18 other sites at this grid supply point in the September 2026 edition, 2 of them at OVERTON, the same primary substation. In all, the sites here total 458 MW: 65 MW connected, 393 MW accepted to connect.

See all 18

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose