KILN FIELDS RENEWABLE ENERGY LIMITED

KILN FIELDS RENEWABLE ENERGY LIMITED at BRAMLEY (BASI)

SSEN Embedded Capacity Register, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
KILN FIELDS RENEWABLE ENERGY LIMITED
Site name
Not stated
Address
KILN FIELDS, READING ROAD, HOOK, HAMPSHIRE, RG27 0LE
Grid reference
Easting 472535, northing 160348
Licence area
Southern England (SEPD)
Grid supply point
BRAMLEY (BASI)
Bulk supply point
BASINGSTOKE
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Other or not stated
Energy source 1
OTHER, OTHER: 15 MW registered
Registered capacity
15 MW
Maximum export capacity
14.25 MW
Maximum import capacity
Not stated
Flexible connection
Not stated
In a connection queue
Not published by SSEN
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SSEN
Transmission reinforcement reference
Not published by SSEN
Export MPAN
2000060330787
Import MPAN
2000060330778
Last updated
12 Feb 2026
Tracked since
June 2024 edition

Change history

Tracked since the June 2024 edition, across 30 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at BRAMLEY (BASI)

GSP view

19 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 459 MW: 65 MW connected, 394 MW accepted to connect.

See all 19

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?