York University 10MVA Demand 2MW CHP
York University 10MVA Demand 2MW CHP at Osbaldwick
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 12 Sep 2022
- Status
- Connected
- Customer
- York University 10MVA Demand 2MW CHP
- Site name
- York University 10MVA Demand 2MW CHP
- Address
- Heslington East Campus, Innovation Close, Heslington, North Yorkshire, YO10 5ZF
- Grid reference
- Easting 462650, northing 450883
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- Osbaldwick
- Bulk supply point
- Melrosegate
- Primary substation
- York University
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam turbine (thermal power plant): 2 MW registered
- Registered capacity
- 2 MW
- Maximum export capacity
- 2 MW
- Maximum import capacity
- 9.5 MW
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 11 Mar 2020
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574200344413
- Import MPAN
- 1580001776456
- Last updated
- 11 Sep 2024
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Osbaldwick
GSP view29 other sites at this grid supply point in the September 2026 edition, 2 of them at York University, the same primary substation. In all, the sites here total 1.5 GW: 0.1 GW connected, 1.4 GW accepted to connect.
- University of York, Heslington East CampusUniversity of York, Heslington East Campus, Gas and other fossil, York University primaryConnected3.12 MW
- Naburn Sewage Switch Non-Exporting GenerationNaburn Sewage Switch Non-Exporting Generation, Gas and other fossil, York University primaryConnected1.25 MW
- Clock and Grimeston Farm Solar & BESSClock and Grimeston Farm Solar & BESS, Storage, Clock and Grimeston Farm Direct primaryAccepted200 MW
- Sheriff Hutton 80MW HybridSheriff Hutton 80MW Hybrid, Solar, Sheriff Hutton 80MW Hybrid primaryAccepted160 MW
- Birdstall Estate HybridBirdstall Estate Hybrid, Solar, Birdstall Estate Hybrid primaryAccepted99.8 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose