QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Knapton Hybrid

Knapton Hybrid at Osbaldwick

Northern Powergrid Embedded Capacity Register 1MW and Over, March 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Knapton Hybrid
Site name
Knapton Hybrid
Address
Knapton Generating Station, East Knapton, East Knapton, North Yorkshire, YO17 8JF
Grid reference
Easting 488651, northing 477055
Licence area
North East (Northern Powergrid)
Grid supply point
Osbaldwick
Bulk supply point
Knapton Generation
Primary substation
Knapton Generation Direct
Connection voltage
132 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 84 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 30 MW registered
Registered capacity
114 MW
Change to maximum export capacity
114 MW
Change to maximum import capacity
76 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
2 Jun 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
18 Feb 2025
Tracked since
March 2026 edition

Change history

Found in the March 2026 edition only.

Another record at this location is on a separate page.

Changes to its status, capacity, technology or customer, newest first.

  • April 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at Osbaldwick

GSP view

30 other sites at this grid supply point in the September 2026 edition, 2 of them at Knapton Generation Direct, the same primary substation. In all, the sites here total 1.5 GW: 0.1 GW connected, 1.4 GW accepted to connect.

See all 30

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose