QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

York District Hospital

York District Hospital at Osbaldwick

Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
York District Hospital
Site name
York District Hospital
Address
York Hospital, Wigginton Road, York, North Yorkshire, YO31 8HE
Grid reference
Easting 460069, northing 453000
Licence area
North East (Northern Powergrid)
Grid supply point
Osbaldwick
Bulk supply point
Melrosegate
Primary substation
Foss Islands
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam turbine (thermal power plant): 1.161 MW registered
Registered capacity
1.161 MW
Maximum export capacity
1.161 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
Not published by Northern Powergrid
Date accepted
Not stated
Target energisation date
Not published by Northern Powergrid
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
1592001074950
Import MPAN
Not stated
Last updated
12 Jan 2022
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Osbaldwick

GSP view

29 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 1.5 GW: 0.1 GW connected, 1.4 GW accepted to connect.

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose