QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Wadsworth Farm BESS

Wadsworth Farm BESS at Spennymoor GSP

Northern Powergrid Embedded Capacity Register 1MW and Over, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not published by Northern Powergrid
Status
Accepted to connect
Customer
Wadsworth Farm BESS
Site name
Wadsworth Farm BESS
Address
Wadsworth Farm, Toronto, Bishop Auckland, County Durham, DL14 7RL
Grid reference
Easting 418747, northing 531782
Licence area
North East (Northern Powergrid)
Grid supply point
Spennymoor GSP
Bulk supply point
Wadsworth Farm BESS
Primary substation
Wadsworth Farm BESS Direct
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 50 MW registered, storage 50 MWh, 1 hours of storage
Registered capacity
50 MW
Change to maximum export capacity
50 MW
Change to maximum import capacity
47.5 MW
Flexible connection
Yes
In a connection queue
Not published by Northern Powergrid
Date accepted
22 Jun 2023
Date connected
Not stated
Distribution reinforcement reference
Not published by Northern Powergrid
Transmission reinforcement reference
Not published by Northern Powergrid
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Jun 2023
Tracked since
March 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the March 2026 edition, across 9 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Spennymoor GSP

GSP view

34 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.2 GW: 0.1 GW connected, 1.1 GW accepted to connect.

See all 34

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?