Unipres PV
Unipres PV at West Boldon
Northern Powergrid Embedded Capacity Register 1MW and Over, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 1 Sep 2020
- Status
- Connected
- Customer
- Unipres PV
- Site name
- Unipres PV
- Address
- UNIPRES (UK) LTD, CHERRY BLOSSOM WAY, SUNDERLAND, Tyne and Wear, SR5 3RA
- Grid reference
- Easting 434542, northing 559235
- Licence area
- North East (Northern Powergrid)
- Grid supply point
- West Boldon
- Bulk supply point
- West Boldon
- Primary substation
- Usworth
- Connection voltage
- 11 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 4.2 MW registered
- Registered capacity
- 4.2 MW
- Maximum export capacity
- 4.2 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- Not published by Northern Powergrid
- Date accepted
- 7 Jan 2020
- Target energisation date
- Not published by Northern Powergrid
- Distribution reinforcement reference
- Not published by Northern Powergrid
- Transmission reinforcement reference
- Not published by Northern Powergrid
- Export MPAN
- 1574200334902
- Import MPAN
- Not stated
- Last updated
- 4 Jul 2022
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at West Boldon
GSP view14 other sites at this grid supply point in the September 2026 edition, 2 of them at Usworth, the same primary substation. In all, the sites here total 330 MW: 30 MW connected, 300 MW accepted to connect.
- West Boldon BESS FarmWest Boldon BESS Farm, Storage, West Boldon Farm BESS Direct primaryAccepted175 MW
- West Boldon (Triangular Field) BESSWest Boldon (Triangular Field) BESS, Storage, West Boldon BESS primaryAccepted63 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose